Home    About BSD    Careers    Contact Us   Download SpecLink Evaluation Copy

building intelligence for intelligent building

Summary of SpecLink Contents - Masterformat 2004

Division 01 - General Requirements

Sections in this Division = 36

Catalog Key: A=Architectural, S=Structural Engineering, C=Civil Engineering, L=Landscape Architecture, ME=Mechanical/Electrical, *=the Basics

Status Number Title Synopsis Author Catalogs Updated
REV 01 1000 Summary Contract description(s); basic project conditions; work not shown on drawings. BSD ASCLME* Apr 08
Current 01 2000 Price and Payment Procedures Applications for payment, Schedule of Values, modifications, closeout procedures. BSD ASCLME* Feb 08
Current 01 2100 Allowances Allowances procedures; description of allowances. BSD ASCLME Feb 08
Current 01 2200 Unit Prices Unit prices procedures; description of items to be priced or prices to be included. BSD ASCLME Oct 07
Current 01 2300 Alternates Alternatives (alternates) procedures; description of alternatives. BSD ASCLME Feb 08
Current 01 3000 Administrative Requirements Submittals, meetings, schedules, reports, coordination, photographs, etc. BSD ASCLME* Feb 08
Current 01 3114 Facility Services Coordination Major project coordinator; coordination drawings. BSD ASCLME Feb 08
Current 01 3216 Construction Progress Schedule Detailed schedule requirements (augments Section 01300). BSD ASCLME Feb 08
REV 01 3514 LEED Credit Summary ++ Checklist documenting intentions regarding LEED credits; linked to LEED Certification Procedures. BSD ASCLME May 08
REV 01 3515 LEED Certification Procedures Contractor procedures supporting LEED certification; linked to/from LEED Credit Summary. BSD ASCLME May 08
Current 01 3516 LEED Submittal Forms Procedural requirements relating to LEED construction contract administration forms. BSD ASCLME Feb 07
Current 01 3516.01 LEED Material Cost Summary Form For documenting total costs to be used in LEED calculations. BSD ASCLME Feb 07
Current 01 3516.02 LEED Wood-Containing Product List For info on certified wood credits. BSD ASCLME Feb 07
REV 01 3516.03 LEED Metal-Containing Product List Form for collecting information necessary for MR Credit 4 - Recycled Content. BSD ASCLME Apr 08
Current 01 3516.04 LEED Material Content Form For info on recycled, rapidly renewable, and certified wood content. BSD ASCLME May 07
Current 01 3516.05 LEED New Product Source Form Form for collecting information to document MR Credits 5.1 and 5.2. BSD ASCLME Aug 05
Current 01 3516.06 LEED Reused Product Form For info MR Credits 3. BSD ASCLME Feb 07
Current 01 3516.07 LEED Prohibited Content Installer Certification For documenting that no high-VOC adhesives or sealants have been used, and no urea-formaldehyde wood products. BSD ASCLME Feb 07
REV 01 3553 Security Procedures Contractor procedures; augments Section 01500. BSD ASCLME Apr 08
REV 01 4000 Quality Requirements Testing, inspection, mock-ups, reports, certificates; use of reference standards. BSD ASCLME* Apr 08
Current 01 4216 Definitions Definitions not specific to other sections and not in the General Conditions. BSD ASCLME* Nov 07
REV 01 4219 Reference Standards Full title and edition date; use of reference standards (augments Section 014000). BSD ASCLME May 08
Current 01 5000 Temporary Facilities and Controls Requirements not considered the contractor's option; utilities; facilities; services. BSD ASCLME Feb 08
Current 01 5100 Temporary Utilities Electricity, lighting, heating, cooling, ventilation, and water; more detail than 01 5000. BSD ASCLME* Feb 08
Current 01 5213 Field Offices and Sheds Augments Section 015 000 (01500) if more detail is necessary. BSD ASCLME Feb 08
Current 01 5500 Vehicular Access and Parking Augments Section 01500. BSD ASCLME Feb 08
REV 01 5713 Temporary Erosion and Sediment Control Performance and prescriptive requirements; remedies for non-compliance. BSD ASCLME May 08
REV 01 5721 Indoor Air Quality Controls Procedures & testing under Contractor's control; some LEED prerequisites and credits. BSD ASCLME May 08
Current 01 5813 Temporary Project Signage Project identification sign; other optional signs. BSD ASCLME Feb 08
Current 01 6000 Product Requirements Product options and substitutions; delivery, storage, protection. BSD ASCLME* Feb 08
REV 01 7000 Execution and Closeout Requirements Basic installation requirements; cutting/patching; cleaning; starting of systems; etc. BSD ASCLME* Mar 08
REV 01 7419 Construction Waste Management and Disposal Waste management plan; landfill diversion proposals; waste disposal reports. BSD ASCLME Apr 08
Current 01 7800 Closeout Submittals Project record documents; O & M manuals; warranties/bonds. BSD ASCLME Feb 08
REV 01 7900 Demonstration and Training General req for Owner-personnel demonstration, training; Contractor's responsibilities. BSD ASCLME Apr 08
REV 01 9113 General Commissioning Requirements ++ Scope, objectives, procedures, Contractor's responsibilities. BSD ASCLME Apr 08
REV 01 9114 Commissioning Authority Responsibilities ++ Ind Commissioning Authority; not normally part of the construction Contract Documents. BSD ASCLME Apr 08

Section numbers and titles conform to MasterFormat™, 2004 edition, copyright CSI/CSC, The Construction Specifications Institute.
Specification Data Copyright 2008, Building Systems Design, Inc.