Summary of SpecLink Contents -
Masterformat 2004
Division 01 - General Requirements
Sections in this Division = 44
Catalog Key:
A=Architectural, S=Structural Engineering, C=Civil Engineering,
L=Landscape Architecture, ME=Mechanical/Electrical, # or DC=Design Criteria
| Status | Number | Title | Synopsis | Author | Catalogs | Updated |
| Current | 01 1000 | Summary | Contract description(s); basic project conditions; work not shown on drawings. | BSD | ASCLME# | Feb 09 |
| Current | 01 2000 | Price and Payment Procedures | Applications for payment, Schedule of Values, modifications, closeout procedures. | BSD | ASCLME# | Feb 09 |
| Current | 01 2100 | Allowances | Allowances procedures; description of allowances. | BSD | ASCLME# | Jan 09 |
| Current | 01 2200 | Unit Prices | Unit prices procedures; description of items to be priced or prices to be included. | BSD | ASCLME# | Jan 09 |
| Current | 01 2300 | Alternates | Alternatives (alternates) procedures; description of alternatives. | BSD | ASCLME# | Oct 09 |
| Current | 01 3000 | Administrative Requirements | Submittals, meetings, schedules, reports, coordination, photographs, etc. | BSD | ASCLME# | Feb 10 |
| Current | 01 3050 | Design Procedures and Substantiation Requirements | Design procedures for design-build projects; design documentation and substantiation. | BSD | ASCLME# | Jan 09 |
| Current | 01 3114 | Facility Services Coordination | Major project coordinator; coordination drawings. | BSD | ASCLME# | Jan 09 |
| REV | 01 3216 | Construction Progress Schedule | Detailed schedule requirements (augments Section 01300). | BSD | ASCLME# | May 10 |
| Current | 01 3514 | LEED Credit Summary | ++ Pre-2009; Checklist documenting intentions regarding LEED credits; linked to LEED Certification Procedures. | BSD | ASCLME# | Jan 10 |
| Current | 01 3514.01 | LEED-NC 2009 Credit Summary | ++ Checklist documenting intentions regarding LEED credits; linked to LEED Certification Procedures. | BSD | ASCLME# | Jan 10 |
| Current | 01 3514.02 | LEED for Schools 2009 Credit Summary | ++ Pre-2009; Checklist documenting intentions regarding LEED credits; linked to LEED Certification Procedures. | BSD | ASCLME# | Jan 10 |
| Current | 01 3514.03 | LEED-CS 2009 Credit Summary | ++ Checklist documenting intentions regarding LEED credits; linked to LEED Certification Procedures. | BSD | ASCLME# | Jan 10 |
| Current | 01 3514.04 | LEED-CI 2009 Credit Summary | ++ Checklist documenting intentions regarding LEED credits; linked to LEED Certification Procedures. | BSD | ASCLME# | Jan 10 |
| Current | 01 3515 | LEED Certification Procedures | Contractor procedures supporting LEED certification; linked to/from LEED Credit Summary. | BSD | ASCLME# | Jan 10 |
| Current | 01 3516 | LEED Submittal Forms | Procedural requirements relating to LEED construction contract administration forms. | BSD | ASCLME# | Jan 09 |
| Current | 01 3516.01 | LEED Material Cost Summary Form | For documenting total costs to be used in LEED calculations. | BSD | ASCLME# | Jan 09 |
| Current | 01 3516.02 | LEED Wood-Containing Product List | For info on certified wood credits. | BSD | ASCLME# | Jan 09 |
| Current | 01 3516.03 | LEED Metal-Containing Product List | Form for collecting information necessary for MR Credit 4 - Recycled Content. | BSD | ASCLME# | Jan 09 |
| Current | 01 3516.04 | LEED Material Content Form | For info on recycled, rapidly renewable, and certified wood content. | BSD | ASCLME# | Jan 09 |
| Current | 01 3516.05 | LEED New Product Source Form | Form for collecting information to document MR Credits 5.1 and 5.2. | BSD | ASCLME# | Jan 09 |
| Current | 01 3516.06 | LEED Reused Product Form | For info MR Credits 3. | BSD | ASCLME# | Jan 09 |
| Current | 01 3516.07 | LEED Prohibited Content Installer Certification | For documenting that no high-VOC adhesives or sealants have been used, and no urea-formaldehyde wood products. | BSD | ASCLME# | Aug 09 |
| Current | 01 3553 | Security Procedures | Contractor procedures; augments Section 01500. | BSD | ASCLME# | Jan 09 |
| REV | 01 4000 | Quality Requirements | Testing, inspection, mock-ups, reports, certificates; use of reference standards. | BSD | ASCLME# | Apr 10 |
| Current | 01 4100 | Regulatory Requirements | List of regulations applicable to project; for information or as design criteria. | BSD | ASCLME# | Aug 09 |
| Current | 01 4216 | Definitions | Definitions not specific to other sections and not in the General Conditions. | BSD | ASCLME# | May 09 |
| REV | 01 4219 | Reference Standards | Full title and edition date; use of reference standards (augments Section 014000). | BSD | ASCLME# | May 10 |
| Current | 01 5000 | Temporary Facilities and Controls | Requirements not considered the contractor's option; utilities; facilities; services. | BSD | ASCLME# | Feb 09 |
| Current | 01 5100 | Temporary Utilities | Electricity, lighting, heating, cooling, ventilation, and water; more detail than 01 5000. | BSD | ASCLME# | Jan 09 |
| Current | 01 5213 | Field Offices and Sheds | Augments Section 015 000 (01500) if more detail is necessary. | BSD | ASCLME# | Jan 09 |
| Current | 01 5500 | Vehicular Access and Parking | Augments Section 01500. | BSD | ASCLME# | Jan 09 |
| REV | 01 5713 | Temporary Erosion and Sediment Control | Performance and prescriptive requirements; remedies for non-compliance. | BSD | ASCLME# | May 10 |
| Current | 01 5721 | Indoor Air Quality Controls | Procedures & testing under Contractor's control; some LEED prerequisites and credits. | BSD | ASCLME# | Jan 09 |
| Current | 01 5813 | Temporary Project Signage | Project identification sign; other optional signs. | BSD | ASCLME# | Jan 09 |
| REV | 01 6000 | Product Requirements | Product options and substitutions; delivery, storage, protection. | BSD | ASCLME# | May 10 |
| REV | 01 6116 | Volatile Organic Compound (VOC) Content Restrictions | VOC restrictions based on LEED and CHPS. | BSD | ASCLME# | May 10 |
| Current | 01 6116.01 | Accessory Material VOC Content Certification Form | For documenting that no high-VOC accessory materials have been used. | BSD | ASCLME# | Jan 09 |
| REV | 01 7000 | Execution and Closeout Requirements | Basic installation requirements; cutting/patching; cleaning; starting of systems; etc. | BSD | ASCLME# | May 10 |
| Current | 01 7419 | Construction Waste Management and Disposal | Waste management plan; landfill diversion proposals; waste disposal reports. | BSD | ASCLME# | Jan 09 |
| Current | 01 7800 | Closeout Submittals | Project record documents; O & M manuals; warranties/bonds. | BSD | ASCLME# | May 09 |
| Current | 01 7900 | Demonstration and Training | General req for Owner-personnel demonstration, training; Contractor's responsibilities. | BSD | ASCLME# | Apr 09 |
| REV | 01 9113 | General Commissioning Requirements | ++ Scope, objectives, procedures, Contractor's responsibilities. | BSD | ASCLME# | May 10 |
| REV | 01 9114 | Commissioning Authority Responsibilities | ++ Ind Commissioning Authority; not normally part of the construction Contract Documents. | BSD | ASCLME# | May 10 |
Section numbers and titles conform to MasterFormat™,
2004 edition, copyright CSI/CSC, The Construction Specifications
Institute.
Specification Data Copyright 2010, Building Systems Design, Inc.
Home
Contact
Us Copyright Building Systems Design, Inc. 2010S. All rights reserved.
3565 Piedmont Road NE, Two Piedmont Center, Suite 300, Atlanta, GA 30305
404-365-8900 ° 888-BSD-SOFT (273-7638) ° fax 404-365-8912
Revised: June 1, 2010

