Home    About BSD    Careers    Contact Us   Download SpecLink Evaluation Copy

building intelligence for intelligent building

Summary of BSD SpecLink Contents - Masterformat 1995

Division 1 - General Requirements

Sections in this Division = 38

Catalog Key: A=Architectural, S=Structural Engineering, C=Civil Engineering, L=Landscape Architecture, ME=Mechanical/Electrical, *=the Basics

Status Number Title Synopsis Author Catalogs Updated
REV 01100 Summary Contract description(s); basic project conditions; work not shown on drawings. BSD ASCLME* Apr 08
Current 01200 Price and Payment Procedures Applications for payment, Schedule of Values, modifications, closeout procedures. BSD ASCLME* Feb 08
Current 01210 Allowances Allowances procedures; description of allowances. BSD ASCLME Feb 08
Current 01230 Alternatives Alternatives (alternates) procedures; description of alternatives. BSD ASCLME Feb 08
Current 01270 Unit Prices Unit prices procedures; description of items to be priced or prices to be included. BSD ASCLME Oct 07
Current 01300 Administrative Requirements Submittals, meetings, schedules, reports, coordination, photographs, etc. BSD ASCLME* Feb 08
Current 01315 Facility Services Coordination Major project coordinator; coordination drawings. BSD ASCLME Feb 08
Current 01325 Construction Progress Schedule Detailed schedule requirements (augments Section 01300). BSD ASCLME Feb 08
REV 01354 LEED Credit Summary ++ Checklist documenting intentions regarding LEED credits; linked to LEED Certification Procedures. BSD ASCLME Aug 08
REV 01355 LEED Certification Procedures Contractor procedures supporting LEED certification; linked to/from LEED Credit Summary. BSD ASCLME Aug 08
Current 01356 LEED Submittal Forms Procedural requirements relating to LEED construction contract administration forms. BSD ASCLME Aug 07
Current 01357 LEED Material Cost Summary Form For documenting total costs to be used in LEED calculations. BSD ASCLME Feb 07
Current 01358 LEED Wood-Containing Product List For info on certified wood credits. BSD ASCLME Feb 07
REV 01359 LEED Metal-Containing Product List Form for collecting information necessary for MR Credit 4 - Recycled Content. BSD ASCLME Apr 08
Current 01360 LEED New Product Content Form For info on recycled, rapidly renewable, and certified wood content. BSD ASCLME May 07
Current 01361 LEED New Product Source Form Form for collecting information to document MR Credits 5.1 and 5.2. BSD ASCLME Aug 05
Current 01362 LEED Reused Product Form For info MR Credits 3. BSD ASCLME Feb 07
Current 01363 LEED Prohibited Content Installer Certification For documenting that no high-VOC adhesives or sealants have been used, and no urea-formaldehyde wood products. BSD ASCLME Aug 08
REV 01400 Quality Requirements Testing, inspection, mock-ups, reports, certificates; use of reference standards. BSD ASCLME* Jul 08
Current 01422 Definitions Definitions not specific to other sections and not in the General Conditions. BSD ASCLME* Nov 07
REV 01425 Reference Standards Full title and edition date; use of reference standards (augments Section 014000). BSD ASCLME May 08
Current 01500 Temporary Facilities and Controls Requirements not considered the contractor's option; utilities; facilities; services. BSD ASCLME Feb 08
Current 01510 Temporary Utilities Electricity, lighting, heating, cooling, ventilation, and water; more detail than 01 5000. BSD ASCLME* Feb 08
Current 01525 Field Offices Augments Section 015 000 (01500) if more detail is necessary. BSD ASCLME Feb 08
Current 01550 Vehicular Access and Parking Augments Section 01500. BSD ASCLME Feb 08
REV 01565 Security Measures Contractor procedures; augments Section 01500. BSD ASCLME Apr 08
REV 01575 Temporary Erosion and Sedimentation Control Performance and prescriptive requirements; remedies for non-compliance. BSD ASCLME May 08
Current 01585 Project Signs Project identification sign; other optional signs. BSD ASCLME Feb 08
Current 01600 Product Requirements Product options and substitutions; delivery, storage, protection. BSD ASCLME* Feb 08
REV 01700 Execution Requirements Basic installation requirements; cutting/patching; cleaning; starting of systems; etc. BSD ASCLME* Mar 08
REV 01732 Waste Management Waste management plan; landfill diversion proposals; waste disposal reports. BSD ASCLME Apr 08
REV 01734 Indoor Air Quality Procedures & testing under Contractor's control; some LEED prerequisites and credits. BSD ASCLME May 08
Current 01780 Closeout Submittals Project record documents; O & M manuals; warranties/bonds. BSD ASCLME Feb 08
REV 01810 Commissioning ++ Scope, objectives, procedures, Contractor's responsibilities. BSD ASCLME Apr 08
REV 01815 Commissioning Authority Responsibilities ++ Ind Commissioning Authority; not normally part of the construction Contract Documents. BSD ASCLME Apr 08
REV 01820 Demonstration and Training General req for Owner-personnel demonstration, training; Contractor's responsibilities. BSD ASCLME Apr 08

Section numbers and titles conform to MasterFormat™, 1995 edition, copyright CSI/CSC, The Construction Specifications Institute.
Specification Data Copyright 2008, Building Systems Design, Inc.