PerSpective® Catalog Listings - Updated as of March 1, 2008
All Catalog Listings >>
Summary of PerSpective Contents >>
Program Requirements
Sections in this Volume = 2
| Status | Number | Title | Synopsis | Catalogs | Updated |
| Current | 1 | PROGRAM SUMMARY | This section includes a brief overview of the project function, intended as a preamble to the actual project program, which must be prepared separately. This preamble identifies the principal occupancies, spaces in the buildings, and some information about existing conditions. | Performance | May 07 |
| Current | 11 | PROJECT PROGRAM | This section is the table of contents of the project program, which must be prepared separately. This document also includes a guide to the preparation of a program that interfaces correctly with the performance specifications. See the notes at each contents heading for more information. | Performance | Mar 99 |
End of Program Requirements Section Listing
