An Owner-Contractor Agreement and General Conditions of the Contract are used on almost all significant construction contracts. These specify the fundamental terms of the contract, which are not repeated in the specifications. The most commonly used forms of Agreement or General Conditions are preprinted, copyrighted, standard forms published by construction industry associations. Agreements and General Conditions are published as either a single document or as two documents in a coordinated set. When published as a set, both documents must be used for complete contractual terms. Many Owners have their own documents they require design professionals to include in the contract documents.

Although specifiers are not usually responsible for preparing these documents, they must know what is in them, as the terms of both the Agreement and the General Conditions could affect the content or terms embodied in the specifications. In particular, preparing the specifications assuming the wrong contractual relationships could have significant cost consequences for the Owner. As in many other aspects of life, making assumptions here is often dangerous.

If the contract documents will be based on a standard form or forms, it's usually a simple matter to get a copy of it. If the Owner makes modifications to them, you'll need to get a copy of the modifications from the Owner or his legal counsel — these are usually called "Supplementary Conditions" but Owners have a wide variety of names for them. Sometimes design professionals maintain custom General and/or Supplementary Conditions for repeat Owners, but design professionals are usually advised to seek legal counsel before initiating any modifications.

Assembling the Agreement and Conditions of the Contract

Even though specifiers are not responsible for choosing standard forms or for preparing modifications to them, specifiers are very often required to assemble these documents into the Project Manual. Unless you find that someone else will be doing that, you will need to get information from the Owner or his legal counsel on what to do.

  • First find out whether you are expected to do this.
  • If so, you need to get specific, detailed information on what to do.
  • If not, you still need to get a copy. If you can't, try to find out what the fundamental terms of the contract are, so you can coordinate your specs. (There is really no reason an Owner should refuse to provide you a copy — except that his lawyers might not have finished it yet.)

The best way to get the information you need is to use AIA Document G612 - Owner's Instructions to the Architect Regarding the Construction Contract highly recommended. This is a detailed checklist covering general project delivery issues, construction administration, form of contracts, bidding requirements, owner-furnished items, separate contracts, payments to Contractor, retainage, and insurance. Get your free copy of AIA G612 here.

The normal way to use AIA G612 is to send it to the Owner as a formal request for information. A sample cover letter is included, which is itself instructive. However, AIA G612 is such a good checklist that you should use it whether you are assembling the Agreement and Conditions of the Contract documents or not, to reassure yourself that you have asked all the relevant questions.

Coordinating the Specifications with the Conditions of the Contract

SpecLink's master text is carefully written to avoid the necessity of tailoring the language to any particular general conditions. However, it does assume that the general conditions will be more or less like AIA A201 or EJCDC C-700 (see below). The basic terms are:

  • The Owner has a contract with a single prime Contractor.
  • The Design Professional will be providing construction administration that includes site observation and approval of Applications for Payment.
If your project conditions or contractual relationships differ, changes may be necessary to the specification text. Multiple prime contracts will not normally require much more than an enumeration of the contracts and a description of their scope.

SpecLink referenced document Note: The above discussion refers to the SpecLink construction specifications. The Short Form specifications do not assume any contractual conditions and don't include any provisions that are likely to need to be changed. The PerSpective performance specifications are entirely different; for Design-Build, the procurement and contracting documents assume a fixed-price, best value competitively bid contract with terms based on DBIA documents.

Sources of Standard Forms of Agreement and General Conditions of the Construction Contract

SpecLink referenced document You can buy paper copies of most of these documents for a low cost. For general educational purposes, AIA A101 & A201 are recommended to architects. EJCDC C-520 & C-700 are recommended to engineers who act as the prime design professional.

American Institute of Architects (AIA) Contract Documents, www.aia.org

The most commonly used documents for design-bid-build are:

  • highly recommended AIA A101 - Standard Form of Agreement Between Owner and Contractor, Stipulated Sum
  • highly recommended AIA A201 - General Conditions of the Contract for Construction
  • highly recommended AIA G612 - Owner's Instructions to the Architect Regarding the Construction Contract (Free Copy)

AIA documents are sold through local distributors – locations can be found on AIA's website or contact the National AIA Bookstore, at (202) 626-7541.

Engineers Joint Contract Documents Committee (EJCDC)

EJCDC documents are oriented to consulting engineering and design-build practice. Tha most commonly used documents for design-bid-build are:

  • highly recommended EJCDC C-520 - Standard Form of Agreement Between Owner and Contractor; Stipulated Price
  • highly recommended EJCDC C-700 - Standard General Conditions of the Construction Contract

EJCDC documents are available from the participating organizations. For current sources, go to www.ejcdc.org.

Associated General Contractors, Inc. (AGC), www.agc.org

AGC publishes standard contract forms for almost every contractual relationship and project delivery method. Their major forms are:

  • For Design-Bid-Build: highly recommended AGC 200 - Standard Form of Agreement and General Conditions Between Owner and Contractor (Where the Contract Price is a Lump Sum)
  • For Design-Build: AGC 415 - Standard Form of Agreement and General Conditions Between Owner and Design-Builder (Where the Basis of Payment is a Lump Sum Based on an Owner's Program Including Schematic Design Documents)

AGC documents are available from:

  • In paper: www.agc.org or call (202) 393-2040.
  • Electronically, in ConsensusDocs, which uses the BSD SpecLink engine to automate preparation of documents.

Design-Build Institute of America, Inc (DBIA), www.dbia.org

DBIA specializes in contract documents for design-build. Their most commonly used documents are:

  • DBIA 525 - Standard Form of Agreement Between Owner and Design-Builder--Lump Sum
  • DBIA 535 - Standard Form of General Conditions of Contract Between Owner and Design-Builder

DBIA documents are available at their website or call (202) 682-0110. DBIA also publishes contracting guides and other documents on various aspects of design-build.